Construction safety and protection of high operating

More than in the height of construction work, which falls, against objects is the focus of accident prevention. The so-called high places, where the fall height is 2 meters above the base level, it may fall, in the height of the operation. As the surface high operating activities of small, surrounded by overhead, wind, and therefore dangerous to a very complex work, a little negligent, will cause serious accidents. The following operations must be strictly enforced height of several practices.
1, workers in high places to mouth wearing a tight dress, wearing non-slip shoes, safety helmet, safety belt tied at the waist.

2, encountered heavy fog, heavy rain and strong winds for more than six, to prohibit height operations.

3, high operating temporarily without tools, into the tool bag, with the use to take. Department of commonly used tools should carry around, no need to remove the tools and materials should be used to tether slide into the ground, shall not be thrown down, so as not to fall injuries. After the clean-up operations should be promptly delivered to the designated location, to prevent the left at the job site and fall injury.

To ensure high job security, except to note that the above practices, but also pay attention to protection.

The first is the high platform of protection. Height of platform four weeks to have 1 to 1.2 meters of protective railings, railing to hang outside the network closed. The bottom of the four weeks to shop stall feet 18 cm high, the platform plate is 5 cm thick wood. Platforms need to set up ladders for staff up and down the ladder to the platform frame fixation, pedal spacing of 30 cm.

Limb protection operation can not be ignored. Operations in height, does not face the edge of the envelope facilities, or facilities, although the envelope, but the height of less than 0.8 meters, the height of operations for the limb on the job. Limb should then puts up protective railing, and hanging net closed. Scaffolding used in the walls, the scaffolding outside closed with a net; inside the gap between the wall should also be closed to prevent the fall litter.

During the construction process, there are various holes, there is the danger of falling from the hole. According to the location of holes of different hole size, the construction requirements of the program should be firmly closed, tight, no person shall arbitrarily remove, such as to be removed, subject to the approval of the person responsible for the site.
| Updated:2011.11.17    Source:    Clicks:1586